Me, Ry and C loaded up the truck with shale in between sips of budweiser on a recent saturday -- I mean, what better way to spend the weekend than moving around large heavy objects.
I cobbed together some templates, hammered in some ridiculously bright organge stakes, and held my breath with each pour that the "templates" would hold.
My truck is only a half ton, and we needed about 50, 60 lb bags of crete to finish the entire bank. So we filled my truck up with 3/4 of a ton and poured as much as we could. I think we've progressed tremendously since the first pour. We've probably got another 1/4 - 1/2 ton of crete to pick up and mix in order to finish the job. Hopefully we'll be able to post some pics of dudes skating this spot, real soon. Until then, we'll leave you with a pic of a dude who looks like he was TKO'd in rd 3. This is what happens when you build and skate a manny pad (after 20 beers), instead of pouring some sick crete:
Blue Collar weekends are all the rage these days. Pour it n' Destroy it.